Basement development plumbing

Full rough-in for an undeveloped basement — bathroom, wet bar, laundry and floor drains set before the framing closes up.

Basement development plumbing

Basement development plumbing in Calgary

Developing a basement is the cheapest time to get the plumbing right, because nothing is buried yet. Drains have to be cut in below slab, vents have to reach the stack, and a below-grade bathroom often needs its own pump.

Signs you need this service

  • Adding a bathroom, wet bar or laundry to an undeveloped basement
  • Planning a legal secondary suite that needs its own fixtures
  • A rough-in stub left by the builder that you want to use

What’s included

  • Slab cut, drains laid and backfilled for new fixtures
  • Venting run and tied into the existing stack
  • Sewage ejector or macerator where the drain sits below the main
  • Permits pulled and rough-in inspection passed before framing closes

Every job is quoted upfront, completed to the Alberta Plumbing and Gas Code and backed by our two-year workmanship warranty. Call for a free quote, or send the details through and we’ll come back to you the same day.